The equipment has been developed for EADS-CASA, in order to carry out the EFA
   aircraft maintenance.

   RAMEM
was responsible for the design, manufacture, assembly, testing, compatibility,    ILS and documentation. The design was based on functional, structural, weight,    maintenance, reliability, manoeuvrability, transportability, compatibility with biological
   and    chemical warfare,… requirements.